Welcome to Polypads Online | Call Us: +44 1842 752020

Basket

2m Air Web Long Lead

£10.25

2m Air Web Long Lead (9 Colours)

LEAD SIZE GUIDE (approx)
2.00m – Overall Length upto the trigger (including handle loop)
0.25m – Handle Loop Size
Strong polyproylene padded webbing lead, finished with a substantial trigger to clip onto the dogs collar.

We also manufacture collars in matching colour options and can be bought separately or together at a discounted rate, please view our “Lead & Collar Sets”.

 

In stock
Clear selection
Compare
SKU: N/A Categories: ,

Additional Information

Weight 0.13 kg
Toggle This
  • About Us

    When it comes to first-class British manufacturing PolyPads® are one of the best-known names in the business. Our innovative range of equestrian saddle pads, leg protectors and pet beds are designed and manufactured exclusively in the UK, using the highest quality materials available. Our products not only look good but are made to last far longer than imported budget brands.
  • Contact us

    Call: +44 1842 752020
    Email: sales@polypads.co.uk

    Address:
    Polypads,
    Maunside,
    Mansfield
    NG18 5GU

  • Contact form

    Please wait...